The World's Largest Public Domain Media Search Engine

power generation capability

public
153 media by topicpage 1 of 2
KENNEDY SPACE CENTER, FLA. -     The late afternoon sun highlights Space Shuttle Atlantis after rollback of the rotating service structure.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff. Seen above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  Below it, extending from the fixed service structure, is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/Ken Thornsley KSC-06pd2044

KENNEDY SPACE CENTER, FLA. - The late afternoon sun highlights Spa...

KENNEDY SPACE CENTER, FLA. - The late afternoon sun highlights Space Shuttle Atlantis after rollback of the rotating service structure. The RSS provides protected access to the orbiter for changeout and se... More

KENNEDY SPACE CENTER, FLA. -   Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115.  Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast.  At right is the 300,000-gallon water tank that releases its contents onto the mobile launcher platform during liftoff to aid sound suppression.   During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2054

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B wh...

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115. Atlantis was originally scheduled to launch at 12:2... More

KENNEDY SPACE CENTER, FLA. -   Space Shuttle Atlantis hurtles toward space, propelled by twin columns of fire from the solid rocket boosters.  Clouds of smoke and steam spread side to side across Launch Pad 39B.  Atlantis is heading for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2155

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis hurtles toward s...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis hurtles toward space, propelled by twin columns of fire from the solid rocket boosters. Clouds of smoke and steam spread side to side across Launch Pad 39B... More

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Commander Brent Jett finishes suiting up for another attempt at liftoff. The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2101

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building a...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Commander Brent Jett finishes suiting up for another attempt at liftoff. The launch attempt on ... More

KENNEDY SPACE CENTER, FLA. - With applause and cheers from the onlookers, Space Shuttle Atlantis roars off the launch pad for a rendezvous with the International Space Station on mission STS-115.  In the foreground is the countdown clock, marking launch and mission-elapsed time, on the grounds of the NASA News Center. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Debbie Odom KSC-06pd2110

KENNEDY SPACE CENTER, FLA. - With applause and cheers from the onlooke...

KENNEDY SPACE CENTER, FLA. - With applause and cheers from the onlookers, Space Shuttle Atlantis roars off the launch pad for a rendezvous with the International Space Station on mission STS-115. In the foregr... More

STS117-S-014 (8 June 2007) --- Through the large windows in the Launch Control Center, NASA officials watch the launch of Space Shuttle Atlantis on mission STS-117. Atlantis and its seven-member crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-014

STS117-S-014 (8 June 2007) --- Through the large windows in the Launch...

STS117-S-014 (8 June 2007) --- Through the large windows in the Launch Control Center, NASA officials watch the launch of Space Shuttle Atlantis on mission STS-117. Atlantis and its seven-member crew head towar... More

KENNEDY SPACE CENTER, FLA.  -   In the Space Station Processing Facility, an overhead crane moves the Port 3/4 truss segment across the floor to the waiting payload canister for installation in the orbiter Atlantis. The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1633

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane moves the Port 3/4 truss segment across the floor to the waiting payload canister for installation in the orbiter Atla... More

KENNEDY SPACE CENTER, FLA. -  Storm clouds fill the sky from Launch Pad 39B, at right, west beyond the Vehicle Assembly Building.  Space Shuttle Atlantis still sits on the pad after a scrub was called Aug. 27 due to a concern with fuel cell 1. Towering above the shuttle is the 80-foot lightning mast. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2067

KENNEDY SPACE CENTER, FLA. - Storm clouds fill the sky from Launch Pa...

KENNEDY SPACE CENTER, FLA. - Storm clouds fill the sky from Launch Pad 39B, at right, west beyond the Vehicle Assembly Building. Space Shuttle Atlantis still sits on the pad after a scrub was called Aug. 27 d... More

KENNEDY SPACE CENTER, FLA. -  Hurtling toward space, Space Shuttle Atlantis clears the lightning mast atop the fixed service structure on Launch Pad 39B.  Clouds of smoke and steam nearly obscure the pad.  Atlantis is heading for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. KSC-06pp2152

KENNEDY SPACE CENTER, FLA. - Hurtling toward space, Space Shuttle Atl...

KENNEDY SPACE CENTER, FLA. - Hurtling toward space, Space Shuttle Atlantis clears the lightning mast atop the fixed service structure on Launch Pad 39B. Clouds of smoke and steam nearly obscure the pad. Atla... More

KENNEDY SPACE CENTER, FLA. -   After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 have had the traditional breakfast before their third attempt to launch on Space Shuttle Atlantis.  Seated left to right are Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner, Commander Brent Jett, Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Daniel Burbank.  MacLean is with the Canadian Space Agency.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  Following the breakfast, the crew will don their launch suits before heading to Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2090

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due t...

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 have had the traditional breakfast before their third attempt to launch on Space... More

KENNEDY SPACE CENTER, FLA. -- A view of the launch of Space Shuttle Atlantis on mission STS-115 as it soars over the Space Coast, taken from NASA's WB-57 aircraft.  Atlantis is heading for a rendezvous with the International Space Station, delivering the 17.5-ton, bus-sized P3/P4 integrated truss segment for installation. Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly.  The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: Courtesy of Robert Rivers KSC-06pd2465

KENNEDY SPACE CENTER, FLA. -- A view of the launch of Space Shuttle At...

KENNEDY SPACE CENTER, FLA. -- A view of the launch of Space Shuttle Atlantis on mission STS-115 as it soars over the Space Coast, taken from NASA's WB-57 aircraft. Atlantis is heading for a rendezvous with the... More

KENNEDY SPACE CENTER, FLA. -  Nearly obscured by its own contrail, Space Shuttle Atlantis hurtles toward space for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Ken Thornsley KSC-06pd2121

KENNEDY SPACE CENTER, FLA. - Nearly obscured by its own contrail, Spa...

KENNEDY SPACE CENTER, FLA. - Nearly obscured by its own contrail, Space Shuttle Atlantis hurtles toward space for a rendezvous with the International Space Station on mission STS-115. Liftoff was on-time at 1... More

STS117-S-031 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-031

STS117-S-031 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-031 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

KENNEDY SPACE CENTER, FLA. -  During suitup in  the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank tests the communication system in his helmet.  Burbank is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis.  On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2086

KENNEDY SPACE CENTER, FLA. - During suitup in the Operations and Che...

KENNEDY SPACE CENTER, FLA. - During suitup in the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank tests the communication system in his helmet. Burban... More

KENNEDY SPACE CENTER, FLA. -   Clouds spread throughout the sky behind Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115.  Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast.  At right is the 300,000-gallon water tank that releases its contents onto the mobile launcher platform during liftoff to aid sound suppression.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2057

KENNEDY SPACE CENTER, FLA. - Clouds spread throughout the sky behind...

KENNEDY SPACE CENTER, FLA. - Clouds spread throughout the sky behind Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115. Atlantis was originally scheduled... More

KENNEDY SPACE CENTER, FLA. -   Space Shuttle Atlantis is bathed in light on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Jim Grossmann KSC-06pd2047

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis is bathed in lig...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis is bathed in light on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but a 24-hour scrub was called by mission... More

KENNEDY SPACE CENTER, FLA. -  A heavy bank of storm clouds gather behind Space Shuttle Atlantis on Launch Pad 39B.   Atlantis was originally scheduled to launch Aug. 27, but  a scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2065

KENNEDY SPACE CENTER, FLA. - A heavy bank of storm clouds gather behi...

KENNEDY SPACE CENTER, FLA. - A heavy bank of storm clouds gather behind Space Shuttle Atlantis on Launch Pad 39B. Atlantis was originally scheduled to launch Aug. 27, but a scrub was called by mission manag... More

KENNEDY SPACE CENTER, FLA. -   The lights on Launch Pad 39B paint columns of light in the water next to the pad where Space Shuttle Atlantis is illuminated. Atlantis was originally scheduled to launch on Aug. 27, but  a scrub was called by mission managers due to a concern with fuel cell 1.  Atlantis is scheduled to lift off at 11:41 a.m. EDT Sept. 8.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Ken Thornsley KSC-06pd2072

KENNEDY SPACE CENTER, FLA. - The lights on Launch Pad 39B paint colu...

KENNEDY SPACE CENTER, FLA. - The lights on Launch Pad 39B paint columns of light in the water next to the pad where Space Shuttle Atlantis is illuminated. Atlantis was originally scheduled to launch on Aug. 2... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner dons his launch and re-entry suit before heading to the launch pad.  Tanner is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2076

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner dons his launch and re-entry suit before heading to the launch pad. ... More

KENNEDY SPACE CENTER, FLA. - The fiery launch of Space Shuttle Atlantis makes a perfect picture against the blue Florida sky as Atlantis heads for a rendezvous with the International Space Station on mission STS-115. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/George Shelton KSC-06pd2114

KENNEDY SPACE CENTER, FLA. - The fiery launch of Space Shuttle Atlanti...

KENNEDY SPACE CENTER, FLA. - The fiery launch of Space Shuttle Atlantis makes a perfect picture against the blue Florida sky as Atlantis heads for a rendezvous with the International Space Station on mission ST... More

KENNEDY SPACE CENTER, FLA. -   Space Shuttle Atlantis appears enveloped in the smoke and steam created at liftoff from Launch Pad 39B.  Liftoff was on-time at 11:14:55 a.m. EDT.  Atlantis is heading for space and its rendezvous with the International Space Station on mission STS-115.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Sandra Joseph & Robert Murray KSC-06pd2125

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis appears envelope...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis appears enveloped in the smoke and steam created at liftoff from Launch Pad 39B. Liftoff was on-time at 11:14:55 a.m. EDT. Atlantis is heading for space a... More

KENNEDY SPACE CENTER, FLA. -  Although it appears to be standing on twin columns of fire, Space Shuttle Atlantis leaps off the launch pad, heading toward space for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Sandra Joseph & Robert Murray KSC-06pd2122

KENNEDY SPACE CENTER, FLA. - Although it appears to be standing on tw...

KENNEDY SPACE CENTER, FLA. - Although it appears to be standing on twin columns of fire, Space Shuttle Atlantis leaps off the launch pad, heading toward space for a rendezvous with the International Space Stat... More

KENNEDY SPACE CENTER, FLA. -   Tree limbs frame the brilliant launch of Space Shuttle Atlantis as it flees the smoke and steam below, heading for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo courtesy of Nikon/Scott Andrews KSC-06pd2127

KENNEDY SPACE CENTER, FLA. - Tree limbs frame the brilliant launch o...

KENNEDY SPACE CENTER, FLA. - Tree limbs frame the brilliant launch of Space Shuttle Atlantis as it flees the smoke and steam below, heading for a rendezvous with the International Space Station on mission STS... More

STS117-S-029 (8 June 2007) --- The drifting smoke plumes from the launch of Space Shuttle Atlantis (out of frame) swirl above the Vehicle Assembly Building near sunset. Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-029

STS117-S-029 (8 June 2007) --- The drifting smoke plumes from the laun...

STS117-S-029 (8 June 2007) --- The drifting smoke plumes from the launch of Space Shuttle Atlantis (out of frame) swirl above the Vehicle Assembly Building near sunset. Atlantis and its seven-member STS-117 cre... More

KENNEDY SPACE CENTER, FLA. -    Early evening shadows glide across Space Shuttle Atlantis after rollback of the rotating service structure on Launch Pad 39B.   The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff. In the background is the Atlantic Ocean.  Extended from the fixed service structure at left is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter. Seen above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/George Shelton KSC-06pd2041

KENNEDY SPACE CENTER, FLA. - Early evening shadows glide across Spa...

KENNEDY SPACE CENTER, FLA. - Early evening shadows glide across Space Shuttle Atlantis after rollback of the rotating service structure on Launch Pad 39B. The RSS provides protected access to the orbiter f... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Pilot Christopher Ferguson checks his helmet during suitup before heading to the launch pad. Ferguson is making his first shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis.  On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2087

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Pilot Christopher Ferguson checks his helmet during suitup before heading to the launch pad. Ferguson ... More

KENNEDY SPACE CENTER, FLA. -   In the White Room on Launch Pad 39B, STS-115 Mission Specialist Steven MacLean adjusts his launch suit while talking with the closeout crew.  MacLean, who represents the Canadian Space Agency, is making his second shuttle flight.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2163

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, ST...

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-115 Mission Specialist Steven MacLean adjusts his launch suit while talking with the closeout crew. MacLean, who represents the Canadian ... More

KENNEDY SPACE CENTER, FLA. - From the top of the Vehicle Assembly Building, the fiery launch of Space Shuttle Atlantis is seen against the background of the Atlantic Ocean to the east while billows of smoke and steam roll across the launch pad.  Atlantis is heading for a rendezvous with the International Space Station on mission STS-115.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/George Shelton KSC-06pd2113

KENNEDY SPACE CENTER, FLA. - From the top of the Vehicle Assembly Buil...

KENNEDY SPACE CENTER, FLA. - From the top of the Vehicle Assembly Building, the fiery launch of Space Shuttle Atlantis is seen against the background of the Atlantic Ocean to the east while billows of smoke and... More

KENNEDY SPACE CENTER, FLA. - With a fiery liftoff, Space Shuttle Atlantis roars off the launch pad for a rendezvous with the International Space Station on mission STS-115. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Dennis Sabo KSC-06pd2111

KENNEDY SPACE CENTER, FLA. - With a fiery liftoff, Space Shuttle Atlan...

KENNEDY SPACE CENTER, FLA. - With a fiery liftoff, Space Shuttle Atlantis roars off the launch pad for a rendezvous with the International Space Station on mission STS-115. After launch attempts were scrubbed A... More

STS117-S-036 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-036

STS117-S-036 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-036 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-012 (8 June 2007) --- The drifting smoke plumes from the launch of Space Shuttle Atlantis (out of frame) swirl above the Vehicle Assembly Building near sunset. Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-012

STS117-S-012 (8 June 2007) --- The drifting smoke plumes from the laun...

STS117-S-012 (8 June 2007) --- The drifting smoke plumes from the launch of Space Shuttle Atlantis (out of frame) swirl above the Vehicle Assembly Building near sunset. Atlantis and its seven-member STS-117 cre... More

STS117-S-023 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-023

STS117-S-023 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-023 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-038 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-038

STS117-S-038 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-038 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

KENNEDY SPACE CENTER, FLA. -  Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center.  In the background is the Vehicle Assembly Building.  In the foreground is the lower parking lot for the NASA News Center where the media's vehicles and satellite trucks are situated the day before (L-1) the second scheduled launch attempt for Space Shuttle Atlantis on mission STS-115.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2071

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the L...

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center. In the background is the Vehicle Assembly Building. In the foreground is the lower p... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner waits to complete suiting up before heading to the launch pad.  Tanner is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis.  On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2085

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner waits to complete suiting up before heading to the launch pad. Tanne... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean checks his glove during suitup before heading to the launch pad. MacLean is with the Canadian Space Agency.  MacLean is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2080

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean checks his glove during suitup before heading to the launch pad. Mac... More

KENNEDY SPACE CENTER, FLA. -   Smoke and steam billow across Launch Pad 39B as Space Shuttle Atlantis hurtles into the sky for its rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After several earlier launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo courtesy of Nikon/Scott Andrews KSC-06pd2130

KENNEDY SPACE CENTER, FLA. - Smoke and steam billow across Launch Pa...

KENNEDY SPACE CENTER, FLA. - Smoke and steam billow across Launch Pad 39B as Space Shuttle Atlantis hurtles into the sky for its rendezvous with the International Space Station on mission STS-115. Liftoff wa... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper is donning her  launch and re-entry suit before heading to the launch pad for another attempt at liftoff.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2094

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper is donning her launch and re-entry suit before headin... More

KENNEDY SPACE CENTER, FLA. -   Space Shuttle Atlantis roars into the sky above the primitive sand dunes in the foreground.  Heading  for its rendezvous with the International Space Station on mission STS-115,  liftoff was on-time at 11:14:55 a.m. EDT. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Sandra Joseph & Robert Murray KSC-06pd2124

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis roars into the s...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis roars into the sky above the primitive sand dunes in the foreground. Heading for its rendezvous with the International Space Station on mission STS-115, ... More

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atlantis away from the smoke and steam below and into the sky for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.   Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Ken Thornsley KSC-06pd2119

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atla...

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atlantis away from the smoke and steam below and into the sky for a rendezvous with the International Space Station on mission STS-115. Liftoff... More

STS117-S-015 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-015

STS117-S-015 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-015 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-025 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-025

STS117-S-025 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-025 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-009 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-009

STS117-S-009 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-009 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-026 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-026

STS117-S-026 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-026 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-032 (8 June 2007) --- Framed here by branches, the Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-032

STS117-S-032 (8 June 2007) --- Framed here by branches, the Space Shut...

STS117-S-032 (8 June 2007) --- Framed here by branches, the Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff... More

STS117-S-035 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-035

STS117-S-035 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-035 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

KENNEDY SPACE CENTER, FLA. -    The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2050

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space ...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -   The rotating service structure (left) on Launch Pad 39B is rolled back to reveal Space Shuttle Atlantis.   The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/George Shelton KSC-06pd2039

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) o...

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) on Launch Pad 39B is rolled back to reveal Space Shuttle Atlantis. The RSS provides protected access to the orbiter for changeout and servi... More

KENNEDY SPACE CENTER, FLA.  -   In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment toward the waiting payload canister for installation in the orbiter Atlantis. On the right end are the mast canisters for the solar arrays. The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1634

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment toward the waiting payload canister for installation in the orbiter Atlantis. On the... More

KENNEDY SPACE CENTER, FLA. -  The rotating service structure (left) on Launch Pad 39B begins rolling back to reveal Space Shuttle Atlantis.   The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/George Shelton KSC-06pd2038

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) on...

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) on Launch Pad 39B begins rolling back to reveal Space Shuttle Atlantis. The RSS provides protected access to the orbiter for changeout and s... More

KENNEDY SPACE CENTER, FLA. -   Space Shuttle Atlantis is bathed in light on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Jim Grossmann KSC-06pd2048

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis is bathed in lig...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis is bathed in light on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but a 24-hour scrub was called by mission... More

KENNEDY SPACE CENTER, FLA. -  After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 enjoy the traditional breakfast before their second attempt to launch on Space Shuttle Atlantis.  Seated left to right are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Pilot Christopher Ferguson, Commander Brent Jett and Mission Specialists Steven MacLean and Daniel Burbank.  MacLean is with the Canadian Space Agency.  Following the breakfast, the crew will don their launch suits before heading to Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Kim Shiflett KSC-06pd2075

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to...

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 enjoy the traditional breakfast before their second attempt to launch on Space Sh... More

KENNEDY SPACE CENTER, FLA. -   In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean signals "go" for another attempt at liftoff.  MacLean is with the Canadian Space Agency. The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2092

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean signals "go" for another attempt at liftoff. MacLean is with the C... More

KENNEDY SPACE CENTER, FLA. -  Trailing fire and a plume of smoke, Space Shuttle Atlantis leaves a dance of lights on nearby water as it hurtles toward space for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2148

KENNEDY SPACE CENTER, FLA. - Trailing fire and a plume of smoke, Spac...

KENNEDY SPACE CENTER, FLA. - Trailing fire and a plume of smoke, Space Shuttle Atlantis leaves a dance of lights on nearby water as it hurtles toward space for a rendezvous with the International Space Station... More

KENNEDY SPACE CENTER, FLA. -   In the White Room on Launch Pad 39B, STS-115 Commander Brent Jett gets help with his launch suit from the closeout crew before entering Space Shuttle Atlantis.  Jett is making his fourth shuttle flight.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  STS-115 is scheduled to last 11 days with a planned landing at KSC. KSC-06pp2159

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, ST...

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-115 Commander Brent Jett gets help with his launch suit from the closeout crew before entering Space Shuttle Atlantis. Jett is making his... More

STS117-S-030 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-030

STS117-S-030 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-030 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-017 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-017

STS117-S-017 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-017 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-010 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-010

STS117-S-010 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-010 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-022 (8 June 2007) --- Framed here by Florida foliage, the Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-022

STS117-S-022 (8 June 2007) --- Framed here by Florida foliage, the Spa...

STS117-S-022 (8 June 2007) --- Framed here by Florida foliage, the Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. ... More

KENNEDY SPACE CENTER, FLA.  -    In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment into the waiting payload canister for installation in the orbiter Atlantis.  The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station.  The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August.  Photo credit: NASA/Troy Cryder KSC-06pd1635

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facil...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, an overhead crane lowers the Port 3/4 truss segment into the waiting payload canister for installation in the orbiter Atlantis. The tr... More

KENNEDY SPACE CENTER, FLA. -    The rotating service structure (left) on Launch Pad 39B is rolled back to reveal Space Shuttle Atlantis.   The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/Ken Thornsley KSC-06pd2043

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) ...

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) on Launch Pad 39B is rolled back to reveal Space Shuttle Atlantis. The RSS provides protected access to the orbiter for changeout and serv... More

KENNEDY SPACE CENTER, FLA. -   The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS)  still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  At right is the 300,000-gallon water tank that releases its contents onto the mobile launcher platform during liftoff to aid sound suppression. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2051

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space S...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -   The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS)  still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  At right is the 300,000-gallon water tank that releases its contents onto the mobile launcher platform during liftoff to aid sound suppression.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2052

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space S...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -  Storm clouds roll across Launch Pad 39B where Space Shuttle Atlantis still sits on the pad.    Atlantis was originally scheduled to launch Aug. 27, but  a scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2066

KENNEDY SPACE CENTER, FLA. - Storm clouds roll across Launch Pad 39B ...

KENNEDY SPACE CENTER, FLA. - Storm clouds roll across Launch Pad 39B where Space Shuttle Atlantis still sits on the pad. Atlantis was originally scheduled to launch Aug. 27, but a scrub was called by missi... More

KENNEDY SPACE CENTER, FLA. -  The sun radiates on Space Shuttle Atlantis as it heads for space on mission STS-115 to the International Space Station.  Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. KSC-06pp2144

KENNEDY SPACE CENTER, FLA. - The sun radiates on Space Shuttle Atlant...

KENNEDY SPACE CENTER, FLA. - The sun radiates on Space Shuttle Atlantis as it heads for space on mission STS-115 to the International Space Station. Liftoff was on-time at 11:14:55 a.m. EDT. After several lau... More

KENNEDY SPACE CENTER, FLA. - Looking like a work of art, Space Shuttle Atlantis roars into the blue Florida sky atop a column of fire for a rendezvous with the International Space Station on mission STS-115. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Dennis Sabo KSC-06pd2112

KENNEDY SPACE CENTER, FLA. - Looking like a work of art, Space Shuttle...

KENNEDY SPACE CENTER, FLA. - Looking like a work of art, Space Shuttle Atlantis roars into the blue Florida sky atop a column of fire for a rendezvous with the International Space Station on mission STS-115. Af... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis roars off the launch pad for a rendezvous with the International Space Station on mission STS-115.  In the foreground is the countdown clock, marking launch and mission-elapsed time, on the grounds of the NASA News Center. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Webb Dillard KSC-06pd2109

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis roars off the laun...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis roars off the launch pad for a rendezvous with the International Space Station on mission STS-115. In the foreground is the countdown clock, marking launch a... More

KENNEDY SPACE CENTER, FLA. -   Space Shuttle Atlantis leaps off the launch pad as smoke and steam billow behind it.  Atlantis is heading for space and its rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After several earlier launch attempts were scrubbed due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo courtesy of Nikon/Scott Andrews KSC-06pd2128

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis leaps off the la...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis leaps off the launch pad as smoke and steam billow behind it. Atlantis is heading for space and its rendezvous with the International Space Station on miss... More

KENNEDY SPACE CENTER, FLA. -- A view of the launch of Space Shuttle Atlantis on mission STS-115 as it soars over the Space Coast, taken from NASA's WB-57 aircraft.  Atlantis is heading for a rendezvous with the International Space Station, delivering the 17.5-ton, bus-sized P3/P4 integrated truss segment for installation. Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly.  The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: Courtesy of Robert Rivers KSC-06pd2466

KENNEDY SPACE CENTER, FLA. -- A view of the launch of Space Shuttle At...

KENNEDY SPACE CENTER, FLA. -- A view of the launch of Space Shuttle Atlantis on mission STS-115 as it soars over the Space Coast, taken from NASA's WB-57 aircraft. Atlantis is heading for a rendezvous with the... More

STS117-S-020 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-020

STS117-S-020 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-020 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-019 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-019

STS117-S-019 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-019 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew members stride out of the Operations and Checkout Building eager to get to Launch Pad 39B and the start of their mission to the International Space Station. This is the second attempt at launch after a week's postponement due to weather and technical concerns.  On the left side, front to back, are Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Heidemarie Stefanyshyn-Piper.  On the right side, front to back, are Commander Brent Jett and Mission Specialists Daniel Burbank and Joseph Tanner. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2088

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members stride out of ...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members stride out of the Operations and Checkout Building eager to get to Launch Pad 39B and the start of their mission to the International Space Station. This ... More

KENNEDY SPACE CENTER, FLA. -    Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115.  Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast.  At left is the rolled-back rotating service structure with the payload changeout room open.  Just above the orange external tank is the  vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2055

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B w...

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115. Atlantis was originally scheduled to launch at 12:... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Commander Brent Jett looks reflective as he suits up for launch before heading to the launch pad.  Jett is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis.  On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2084

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Commander Brent Jett looks reflective as he suits up for launch before heading to the launch pad. Jet... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew members walk toward the Astrovan that will take them to Launch Pad 39B.  Seen left to right are Mission Specialists Heidemarie Stefanyshyn-Piper, Steven MacLean, Joseph Tanner and Daniel Burbank; Pilot Christopher Ferguson; and Commander Brent Jett.  This is the second attempt at launch after a week's postponement due to weather and technical concerns. Atlantis is scheduled to lift off at 11:41 a.m. EDT on this date from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2089

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members walk toward th...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members walk toward the Astrovan that will take them to Launch Pad 39B. Seen left to right are Mission Specialists Heidemarie Stefanyshyn-Piper, Steven MacLean, ... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank adjusts his glove during suitup before heading to the launch pad.  Burbank is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2081

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank adjusts his glove during suitup before heading to the launch pad. B... More

KENNEDY SPACE CENTER, FLA. -  STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper waves during suitup in the Operations and Checkout Building at NASA Kennedy Space Center.  She is making her first shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis.  On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2083

KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Heidemarie St...

KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper waves during suitup in the Operations and Checkout Building at NASA Kennedy Space Center. She is making her first shuttle f... More

KENNEDY SPACE CENTER, FLA. -    In the White Room on Launch Pad 39B, STS-115 Pilot Christopher Ferguson talks with the closeout crew before entering Space Shuttle Atlantis. Ferguson is making his first shuttle flight.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  STS-115 is scheduled to last 11 days with a planned landing at KSC. KSC-06pp2161

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, S...

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-115 Pilot Christopher Ferguson talks with the closeout crew before entering Space Shuttle Atlantis. Ferguson is making his first shuttle ... More

KENNEDY SPACE CENTER, FLA. - During suitup in the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner signals a "go" for another attempt at liftoff.   The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2103

KENNEDY SPACE CENTER, FLA. - During suitup in the Operations and Check...

KENNEDY SPACE CENTER, FLA. - During suitup in the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner signals a "go" for another attempt at liftoff. The lau... More

KENNEDY SPACE CENTER, FLA. - A phalanx of photographers line the roof of the Vehicle Assembly Building as Space Shuttle Atlantis roars off the launch pad at 11:14:55 a.m. EDT for a rendezvous with the International Space Station on mission STS-115. After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/George Shelton KSC-06pd2115

KENNEDY SPACE CENTER, FLA. - A phalanx of photographers line the roof ...

KENNEDY SPACE CENTER, FLA. - A phalanx of photographers line the roof of the Vehicle Assembly Building as Space Shuttle Atlantis roars off the launch pad at 11:14:55 a.m. EDT for a rendezvous with the Internati... More

KENNEDY SPACE CENTER, FLA. -   Smoke and steam billow across Launch Pad 39B as Space Shuttle Atlantis hurtles into the sky for its rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After several earlier launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo courtesy of Nikon/Scott Andrews KSC-06pd2129

KENNEDY SPACE CENTER, FLA. - Smoke and steam billow across Launch Pa...

KENNEDY SPACE CENTER, FLA. - Smoke and steam billow across Launch Pad 39B as Space Shuttle Atlantis hurtles into the sky for its rendezvous with the International Space Station on mission STS-115. Liftoff wa... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean dons his helmet to complete suiting up for another attempt at liftoff.  MacLean is with the Canadian Space Agency.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2095

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean dons his helmet to complete suiting up for another attempt at liftof... More

KENNEDY SPACE CENTER, FLA. -  Flaming rockets propel Space Shuttle Atlantis into the sky or a rendezvous with the International Space Station on mission STS-115. Appearing below the main engine nozzles s are the blue mach diamonds signal the speed and force at which Atlantis roars into space.  Below Atlantis' tail are pieces of ice dislodged during the launch. Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2146

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atl...

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atlantis into the sky or a rendezvous with the International Space Station on mission STS-115. Appearing below the main engine nozzles s are th... More

KENNEDY SPACE CENTER, FLA. - The STS-115 mission crew respond to well-wishers as they head to the Astrovan for the ride to Launch Pad 39B.  From left are Pilot Christopher Ferguson, Mission Specialists Steven MacLean, Heidemarie Stefanyshyn-Piper, Daniel Burbank and Joseph Tanner (hidden), and Commander Brent Jett.  The crew is eager for another attempt at liftoff after the Sept. 8 scrub.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2104

KENNEDY SPACE CENTER, FLA. - The STS-115 mission crew respond to well-...

KENNEDY SPACE CENTER, FLA. - The STS-115 mission crew respond to well-wishers as they head to the Astrovan for the ride to Launch Pad 39B. From left are Pilot Christopher Ferguson, Mission Specialists Steven M... More

STS117-S-039 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-039

STS117-S-039 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-039 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure on Launch Pad 39B, Space Shuttle Atlantis shines in the late afternoon sun.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff. At right is the 300,000-gallon water tank that releases a deluge of water across the mobile launcher platform during liftoff to aid sound suppression.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/Ken Thornsley KSC-06pd2045

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure on Launch Pad 39B, Space Shuttle Atlantis shines in the late afternoon sun. The RSS provides protected access to the orbiter for ... More

STS117-S-006 (8 June 2007) --- After suiting up, the STS-117 crewmembers exit the Operations and Checkout Building to board the Astrovan, which will take them to launch pad 39A at Kennedy Space Center. On the right (front to back) are astronauts Rick Sturckow, commander; Steven Swanson, Clayton Anderson and Jim Reilly (center back), all mission specialists. On the left (front to back) are astronauts Lee Archambault, pilot; Patrick Forrester and John "Danny" Olivas, both mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the International Space Station. Atlantis will link up with the International Space Station on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-006

STS117-S-006 (8 June 2007) --- After suiting up, the STS-117 crewmembe...

STS117-S-006 (8 June 2007) --- After suiting up, the STS-117 crewmembers exit the Operations and Checkout Building to board the Astrovan, which will take them to launch pad 39A at Kennedy Space Center. On the r... More

KENNEDY SPACE CENTER, FLA. -   Twin columns of fire propel Space Shuttle Atlantis into a clear blue sky after liftoff from Launch Pad 39B.  At left is the fixed service structure, topped by the lightning mast.  Clouds of smoke and steam nearly obscure the pad.  Atlantis is heading for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2153

KENNEDY SPACE CENTER, FLA. - Twin columns of fire propel Space Shutt...

KENNEDY SPACE CENTER, FLA. - Twin columns of fire propel Space Shuttle Atlantis into a clear blue sky after liftoff from Launch Pad 39B. At left is the fixed service structure, topped by the lightning mast. ... More

KENNEDY SPACE CENTER, FLA. -  Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center.  Seen in the photo is the lower parking lot for the NASA News Center where the media's vehicles and satellite trucks are situated the day before (L-1) the second scheduled launch attempt for Space Shuttle Atlantis on mission STS-115.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2069

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the L...

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center. Seen in the photo is the lower parking lot for the NASA News Center where the media's... More

KENNEDY SPACE CENTER, FLA. -  Menacing storm clouds roll  through the Launch Complex 39 Area at NASA's Kennedy Space Center.  Framed between the horizon and the clouds is Space Shuttle Atlantis on Launch Pad 39B.  The flag in the foreground is at the NASA News Center, near the countdown clock.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2070

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the ...

KENNEDY SPACE CENTER, FLA. - Menacing storm clouds roll through the Launch Complex 39 Area at NASA's Kennedy Space Center. Framed between the horizon and the clouds is Space Shuttle Atlantis on Launch Pad 39... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Commander Brent Jett dons his launch and re-entry suit before heading to the launch pad. Jett is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2079

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Commander Brent Jett dons his launch and re-entry suit before heading to the launch pad. Jett is makin... More

KENNEDY SPACE CENTER, FLA. - After suiting up, the STS-115 mission crew exits the Operations and Checkout Building to board the Astrovan to Launch Pad 39B.  On the left, front to back, are Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Heidemarie Stefanyshyn-Piper.  On the right, front to back, are Commander Brent Jett and Mission Specialists Daniel Burbank and Joseph Tanner.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2106

KENNEDY SPACE CENTER, FLA. - After suiting up, the STS-115 mission cre...

KENNEDY SPACE CENTER, FLA. - After suiting up, the STS-115 mission crew exits the Operations and Checkout Building to board the Astrovan to Launch Pad 39B. On the left, front to back, are Pilot Christopher Fer... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank dons his launch and re-entry suit before heading to the launch pad for another attempt at liftoff.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2096

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank dons his launch and re-entry suit before heading to the launch pad f... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank gets a final adjustment on his helmet before heading to the launch pad for another attempt at liftoff.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2097

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank gets a final adjustment on his helmet before heading to the launch p... More

KENNEDY SPACE CENTER, FLA. -  In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper pose while suiting up for the ride to Launch Pad 39B and another attempt at liftoff.  The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC.  Photo credit: NASA/Kim Shiflett KSC-06pd2100

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building ...

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper pose while suiting up for the ride ... More

KENNEDY SPACE CENTER, FLA. -   Flaming rockets propel Space Shuttle Atlantis away from the smoke and steam below and into the sky for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT.  After launch attempts were scrubbed Aug. 27 and 29 and Sept. 3 and 8 due to weather and technical concerns,  this launch was executed perfectly.  Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Sandra Joseph & Robert Murray KSC-06pd2126

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle At...

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atlantis away from the smoke and steam below and into the sky for a rendezvous with the International Space Station on mission STS-115. Lifto... More

KENNEDY SPACE CENTER, FLA. -    Launch of Space Shuttle Atlantis into the deep blue sky is reflected in the nearby water framed by the green underbrush.  Clouds of smoke and steam spread side to side across Launch Pad 39B.  Atlantis is heading for a rendezvous with the International Space Station on mission STS-115.  Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2157

KENNEDY SPACE CENTER, FLA. - Launch of Space Shuttle Atlantis into ...

KENNEDY SPACE CENTER, FLA. - Launch of Space Shuttle Atlantis into the deep blue sky is reflected in the nearby water framed by the green underbrush. Clouds of smoke and steam spread side to side across Lau... More

KENNEDY SPACE CENTER, FLA. -    In the White Room on Launch Pad 39B, STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper gets help with her launch suit from the closeout crew before entering Space Shuttle Atlantis.  Piper is making her first shuttle flight.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station.  STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2162

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, S...

KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper gets help with her launch suit from the closeout crew before entering Space Shuttle A... More

STS117-S-008 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-008

STS117-S-008 (8 June 2007) --- The Space Shuttle Atlantis and its seve...

STS117-S-008 (8 June 2007) --- The Space Shuttle Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Cente... More

STS117-S-013 (8 June 2007) --- The drifting smoke plumes from the launch of Space Shuttle Atlantis (out of frame) swirl above the Vehicle Assembly Building near sunset. Atlantis and its seven-member STS-117 crew head toward Earth-orbit and a scheduled link-up with the International Space Station. Liftoff from Kennedy Space Center's launch pad 39A occurred at 7:38 p.m. (EDT) on June 8, 2007. Onboard are astronauts Rick Sturckow, commander; Lee Archambault, pilot; Jim Reilly, Patrick Forrester, John "Danny" Olivas, Steven Swanson and Clayton Anderson, all mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the station. Atlantis will dock with the orbital outpost on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-013

STS117-S-013 (8 June 2007) --- The drifting smoke plumes from the laun...

STS117-S-013 (8 June 2007) --- The drifting smoke plumes from the launch of Space Shuttle Atlantis (out of frame) swirl above the Vehicle Assembly Building near sunset. Atlantis and its seven-member STS-117 cre... More

Previous

of 2

Next