The World's Largest Public Domain Media Search Engine

burbank

public
1,255 media by topicpage 5 of 13
Burbank uses the ICV Resting Echo Scan on Expedition 30 crew member

Burbank uses the ICV Resting Echo Scan on Expedition 30 crew member

ISS030-E-155942 (20 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, prepares to use the Integrated Cardiovascular (ICV) Resting Echo Scan on a crew member (out of frame) at the Human Researc... More

CAPE CANAVERAL, Fla. – NASA astronaut Dan Burbank, who served as commander of Expedition 30 aboard the International Space Station, reviews still and video imagery of life aboard the orbiting laboratory during his presentation to Kennedy Space Center employees.      Burbank spent 165 days aboard the station during expeditions 29 and 30. For more information on the space station, visit http://www.nasa.gov/mission_pages/station/expeditions/index.html  Photo credit: NASA/Kim Shiflett & Gianni Woods KSC-2013-2597

CAPE CANAVERAL, Fla. – NASA astronaut Dan Burbank, who served as comma...

CAPE CANAVERAL, Fla. – NASA astronaut Dan Burbank, who served as commander of Expedition 30 aboard the International Space Station, reviews still and video imagery of life aboard the orbiting laboratory during ... More

[Chief Joseph, Nez Percé chief, head-and-shoulders portrait, facing front] / E.A. Burbank, Nespelem, Wash.

[Chief Joseph, Nez Percé chief, head-and-shoulders portrait, facing fr...

40025 U.S. Copyright Office. Reproduction from painting by E.A. Burbank, now in the collection of E.E. Ayer, Chicago.

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista Street, Burbank, Los Angeles County, CA

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista St...

Significance: Designed in 1938 and built in 1939, the Casting Building is one of the original buildings constructed at the Burbank Disney Studios on Buena Vista Street after the studio moved from Hyperion Avenu... More

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista Street, Burbank, Los Angeles County, CA

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista St...

Significance: Designed in 1938 and built in 1939, the Casting Building is one of the original buildings constructed at the Burbank Disney Studios on Buena Vista Street after the studio moved from Hyperion Avenu... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Self-help cooperative, Burbank, California. Organized August 1934. Now has seventy-six active members and is fairly successful. Have applied to the Resettlement Administration for a loan. Have farm of one hundred eighty acres, and supply vegetables to members. Also, the dairy yields 120 gallons of milk daily. Sixty-five cows

Self-help cooperative, Burbank, California. Organized August 1934. Now...

Picryl description: Public domain image of an industrial building, factory, workshop, workers, 20th century, free to use, no copyright restrictions.

Woman aircraft worker, Vega Aircraft Corporation, Burbank, Calif. Shown checking electrical assemblies

Woman aircraft worker, Vega Aircraft Corporation, Burbank, Calif. Show...

Picryl description: Public domain historical photo of Second World War, free to use, no copyright restrictions image.

Production. Lockheed P-38 pursuit planes. A partly-finished Lockheed P-38 pursuit ship, including center and nose section, is swung over a rolling cradle to begin its trip down the assembly line of a large Western aircraft plant. As the ship moves from station to station along this line it will receive its engines, wings, landing gear and other essential equipment

Production. Lockheed P-38 pursuit planes. A partly-finished Lockheed P...

Public domain photograph of 1930s-1940s US industrial development, Second World War, US war production, indusry, no copyright restrictions image - Picryl description

Production. Lockheed P-38 pursuit planes. Another twin-engined pursuit plane, a Lockheed P-38, is rolled from the floor of a large Western aircraft plant. On the field it will be fitted with two sets of three-bladed propellers that will pull it through brilliant performances as interceptors of enemy planes

Production. Lockheed P-38 pursuit planes. Another twin-engined pursuit...

Picryl description: Public domain image of a military aircraft, assembly line, industrial facility, 1930s aviation, free to use, no copyright restrictions.

Women aircraft workers. Perched high on the wing of a giant bomber, women of a large West Coast aircraft factory are speeding the installation of electrical units controlling the engine. In this, as in many other U.S. plants, women are gradually replacing or augmenting men on assembly lines, doing important and highly critical work and doing it well

Women aircraft workers. Perched high on the wing of a giant bomber, wo...

Actual size of negative is C (approximately 4 x 5 inches). Title and other information from caption card. Transfer; United States. Office of War Information. Overseas Picture Division. Washington Division; 1944... More

Production. Electric power. Huge transformers feed power to thousands of machines and hand power tools at Vega Aircraft Plant. By reducing electrical current to the voltages proper for plant use, these transformers play an important part in the production of planes for our armed forces. Vega Aircraft Corporation

Production. Electric power. Huge transformers feed power to thousands ...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Car pooling at Lockheed Vega. The company publications take up the cry too. This issue introduces special bus service for those employees living in city areas, urges others to double up and make full use of available cars

Car pooling at Lockheed Vega. The company publications take up the cry...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Production. Aircraft. A young woman worker operates a heavy punch-press in a large Western aircraft plant. A new hair net keeps her hair out of harm's way; gloves protect her hands from metal splinters

Production. Aircraft. A young woman worker operates a heavy punch-pres...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Production. Lockheed P-38 pursuit planes. New Lockheed P-38 pursuit ships receive final inspections and adjustments on assembly lines outside a large Western aircraft plant. After these operations, the ships will be taken out for routine test flights. If the flights prove satisfactory, the new planes will be ready for delivery to the Army

Production. Lockheed P-38 pursuit planes. New Lockheed P-38 pursuit sh...

Picryl description: Public domain image of an aircraft, assembly line, industrial facility, 1930s aviation, free to use, no copyright restrictions.

Women aircraft workers. Perched high on the wing of a giant bomber, women of a large West Coast aircraft factory are speeding the installation of electrical units contolling the engine. The leadman, center, goes from team to team, checking work, lending advice and assistance when necessary. Women are gradually replacing or augmenting men on the assmbly line itself, doing important and highly critical work -- and doing it well

Women aircraft workers. Perched high on the wing of a giant bomber, wo...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Car pooling at Lockheed Vega. And so Don goes to the transportation office to see what can be done. The hope of many employees is to be certified to the rationing board as deserving of new tires or retreads, but if the employee is convenient to existing transportation or company bus line or lives within four miles of plant or can be doubled up with another driver already carrying passengers, certification is not given

Car pooling at Lockheed Vega. And so Don goes to the transportation of...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Car pooling at Lockheed Vega. New bus railheads are established just as quickly as enough employees apply for transportation to justify it. Here, a transportation expert plots new bus routes

Car pooling at Lockheed Vega. New bus railheads are established just a...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Production. Lockheed P-38 pursuit planes. Beginning construction of a center section of a Lockheed P-38 pursuit plane in a Western aircraft plant. Here the trailing edge of a center section is "mated" to the main beam. On a final assembly line, the completed center section will be joined to other plane sections, and noses, engines, wings, landing gear and other equipment will be installed

Production. Lockheed P-38 pursuit planes. Beginning construction of a ...

Public domain photograph of factory building, free to use, no copyright restrictions image - Picryl description

Production. Lockheed P-38 pursuit planes. Fittings are attached to a center section of a Lockheed P-38 pursuit ship in a large Western aircraft plant. On the final assembly line, the completed center section will be joined to other plane sections, and noses, engines, wings, landing gear and other equipment will be installed

Production. Lockheed P-38 pursuit planes. Fittings are attached to a c...

Picryl description: Public domain image of an aircraft, assembly line, industrial facility, 1930s aviation, free to use, no copyright restrictions.

Car pooling at Lockheed Vega. The old clunker in front is a school bus, serving a nearby rural community. School busses can transport both war plant warriors and school children in most cases, and may be the solution to transportation problems of workers living in small communities

Car pooling at Lockheed Vega. The old clunker in front is a school bus...

Picryl description: Public domain image of child labor, exploitation, children workers, economic conditions, free to use, no copyright restrictions.

STS106-369-033 - STS-106 - Burbank and Mastracchio pose in SpaceHab during STS-106

STS106-369-033 - STS-106 - Burbank and Mastracchio pose in SpaceHab du...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (left) and MS Richard ``Rick`` Mastracchio pose in the SpaceHab Double Module. Subject Terms: STS-106, A... More

STS106-390-035 - STS-106 - MS Burbank and MS Mastracchio talk on the middeck during STS-106

STS106-390-035 - STS-106 - MS Burbank and MS Mastracchio talk on the m...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (left) and MS Richard ``Rick`` Mastracchio talk on the middeck of Atlantis, Orbiter Vehicle (OV) 104. Su... More

STS106-374-025 - STS-106 - MS Lu and MS Burbank prepare for an EVA on the middeck during STS-106

STS106-374-025 - STS-106 - MS Lu and MS Burbank prepare for an EVA on ...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Edward Lu (left), wearing a liquid cooling and ventilation garment (LCVG), and MS Daniel Burbank read handbook on the mi... More

STS106-390-032 - STS-106 - Malenchenko, Mastracchio & Burbank work on a laptop in Zarya during STS-106

STS106-390-032 - STS-106 - Malenchenko, Mastracchio & Burbank work on ...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (foreground), MS / cosmonaut Yuri Malenchenko (background top) and MS Richard ``Rick`` Mastracchio work o... More

STS106-390-033 - STS-106 - Malenchenko,Mastracchio & Burbank work on a laptop in Zarya during STS-106

STS106-390-033 - STS-106 - Malenchenko,Mastracchio & Burbank work on a...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (foreground), MS / cosmonaut Yuri Malenchenko (background top) and MS Richard ``Rick`` Mastracchio work o... More

International Space Station (ISS), Russian Space Program

International Space Station (ISS), Russian Space Program

Five NASA astronauts and two cosmonauts representing the Russian Aviation and Space Agency take a break in training from their scheduled September 2000 visit to the International Space Station (ISS). Astronauts... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left to right are Mission Specialists Boris V. Morukov, Yuri I. Malenchenko, Edward T. Lu and Daniel C. Burbank. They and other crew members Commander Terrence W. Wilcutt, Pilot Scott D. Altman and Mission Specialist Robert A. Mastracchio are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0953

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left to right are Mission Specialists B... More

KENNEDY SPACE CENTER, FLA. -- Inside the SPACEHAB module, STS-106 Mission Specialists Richard A. Mastracchio (left) and Edward T. Lu (right) get information from a worker about the equipment in the module. They and other crew members Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov, Yuri I. Malenchenko and Daniel C. Burbank are taking part Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0958

KENNEDY SPACE CENTER, FLA. -- Inside the SPACEHAB module, STS-106 Miss...

KENNEDY SPACE CENTER, FLA. -- Inside the SPACEHAB module, STS-106 Mission Specialists Richard A. Mastracchio (left) and Edward T. Lu (right) get information from a worker about the equipment in the module. They... More

In Orbiter Processing Facility bay 3, STS-106 Mission Specialists Edward T. Lu (center) and Yuri I. Malenchenko (right) familiarize themselves with equipment in the payload bay of Space Shuttle orbiter Atlantis with the help of KSC employees as part of Crew Equipment Interface Test (CEIT) activities for their mission. The other crew members are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0994

In Orbiter Processing Facility bay 3, STS-106 Mission Specialists Edwa...

In Orbiter Processing Facility bay 3, STS-106 Mission Specialists Edward T. Lu (center) and Yuri I. Malenchenko (right) familiarize themselves with equipment in the payload bay of Space Shuttle orbiter Atlantis... More

KENNEDY SPACE CENTER, Fla. -- At the 217-foot level of the Rotating Service Structure on Launch Pad 39B, the STS-106 crew takes a break during Terminal Countdown Demonstration Activities (TCDT) for a group photo. Pictured from left are Mission Specialists Richard A. Mastracchio, Yuri I. Malenchenko and Daniel C. Burbank; Pilot Scott D. Altman; Commander Terrence W. Wilcutt; and Mission Specialists Boris V. Morukov and Edward T. Lu. The TCDT provides the crew with emergency egress training, opportunities to inspect their mission payload in the orbiter’s payload bay, and a simulated launch countdown. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC00pp1177

KENNEDY SPACE CENTER, Fla. -- At the 217-foot level of the Rotating Se...

KENNEDY SPACE CENTER, Fla. -- At the 217-foot level of the Rotating Service Structure on Launch Pad 39B, the STS-106 crew takes a break during Terminal Countdown Demonstration Activities (TCDT) for a group phot... More

KENNEDY SPACE CENTER, Fla.  -- STS-106 Pilot Scott D. Altman, left of STS-106 Commander Terrence W. Wilcutt, answers a question during a press conference at the slide wire basket area of Launch Pad 39-B. Other crew members pictured are, from left, Mission Specialists Boris V. Morukov, Edward T. Lu, Yuri I. Malenchenko, Daniel C. Burbank and Richard A. Mastracchio. Malenchenko and Morukov are with the Russian Aviation and Space Agency. The flight crew were at Kennedy Space Center to take part in Terminal Countdown Demonstration Test (TCDT) activities. The TCDT provides the crew with emergency egress training and opportunities to inspect their mission payload in the orbiter’s payload bay. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC00pp1168

KENNEDY SPACE CENTER, Fla. -- STS-106 Pilot Scott D. Altman, left of ...

KENNEDY SPACE CENTER, Fla. -- STS-106 Pilot Scott D. Altman, left of STS-106 Commander Terrence W. Wilcutt, answers a question during a press conference at the slide wire basket area of Launch Pad 39-B. Other ... More

KENNEDY SPACE CENTER, Fla. -- The STS-106 flight crew gather in the white room of Launch Pad 39-B. Crew members pictured are, from left, Mission Specialists Boris V. Morukov, Yuri I. Malenchenko, Daniel C. Burbank, Commander Terrence W. Wilcutt, Pilot Scott D. Altman, Mission Specialists Richard A. Mastracchio and Edward T. Lu. Malenchenko and Morukov are with the Russian Aviation and Space Agency. The flight crew were at Kennedy Space Center to take part in Terminal Countdown Demonstration Test (TCDT) activities. The TCDT provides the crew with emergency egress training and opportunities to inspect their mission payload in the orbiter’s payload bay. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1170

KENNEDY SPACE CENTER, Fla. -- The STS-106 flight crew gather in the wh...

KENNEDY SPACE CENTER, Fla. -- The STS-106 flight crew gather in the white room of Launch Pad 39-B. Crew members pictured are, from left, Mission Specialists Boris V. Morukov, Yuri I. Malenchenko, Daniel C. Burb... More

Before entering Space Shuttle Atlantis, STS-106 Mission Specialist Daniel C. Burbank is helped getting into his launch and entry suit in the White Room. Behind him is Pilot Scott D. Altman. In the background can be seen the opening into Atlantis. The perfect on-time liftoff of Atlantis on mission STS-106 occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1282

Before entering Space Shuttle Atlantis, STS-106 Mission Specialist Dan...

Before entering Space Shuttle Atlantis, STS-106 Mission Specialist Daniel C. Burbank is helped getting into his launch and entry suit in the White Room. Behind him is Pilot Scott D. Altman. In the background ca... More

The STS-106 crew wave to onlookers as they exit the Operations and Checkout Building on their way to Launch Pad 39B. In rows (front to back) are Commander Terrence W. Wilcutt (left), Pilot Scott D. Altman (right); Mission Specialists Edward T. Lu (left), Yuri I. Malenchenko (right); Richard A. Mastracchio (left), Boris V. Morukov (right); and Daniel C. Burbank (left). Launch of Space Shuttle Atlantis is set for 8:45 a.m. EDT on the fourth flight to the International Space Station. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1260

The STS-106 crew wave to onlookers as they exit the Operations and Che...

The STS-106 crew wave to onlookers as they exit the Operations and Checkout Building on their way to Launch Pad 39B. In rows (front to back) are Commander Terrence W. Wilcutt (left), Pilot Scott D. Altman (righ... More

COAST GUARD ASTRONAUT. NASA public domain image colelction.

COAST GUARD ASTRONAUT. NASA public domain image colelction.

HOUSTON, Texas (Sept. 20)--Coast Guard Lt. Cmdr. Daniel C. Burbank, a Coast Guard helicopter pilot now serving as a NASA astronaut, is greeted in Houston by his family after returning from his mission aboard th... More

S115E05946 - STS-115 - STS-115 MS Burbank prepares the SARJ on the P3 - P4 Truss Segment during EVA

S115E05946 - STS-115 - STS-115 MS Burbank prepares the SARJ on the P3 ...

The original finding aid described this as: Description: View of Astronaut Daniel C. Burbank, Mission Specialist (MS), wearing broken horizontal red striped Extravehicular Mobility Unit (EMU)completing the pre... More

S115E06527 - STS-115 - Tanner and Burbank store lithium hydroxide canisters in the MDDK during Expedition 13 / STS-115 Joint Operations

S115E06527 - STS-115 - Tanner and Burbank store lithium hydroxide cani...

The original finding aid described this as: Description: View of Astronauts Joseph R. (Joe) Tanner (left) and Daniel C. Burbank, both Mission Specialists (MS), store lithium hydroxide (LiOH) canisters in stowa... More

S115E05852 - STS-115 - Burbank prepares the SARJ on the P3 - P4 Truss Segment

S115E05852 - STS-115 - Burbank prepares the SARJ on the P3 - P4 Truss ...

The original finding aid described this as: Description: View of Astronaut Daniel C. Burbank, STS-115 Mission Specialist (MS), prepares the Solar Alpha Rotary Joint (SARJ) on the P3 - P4 Truss during second Ex... More

S115E05795 - STS-115 - MacLean and Burbank performing second EVA spacewalk

S115E05795 - STS-115 - MacLean and Burbank performing second EVA space...

The original finding aid described this as: Description: View of Astronauts Steven G. MacLean (top), Canadian Space Agency (CSA), and Daniel C. Burbank (bottom), STS-115 Mission Specialist (MS) wearing their E... More

S115E05964 - STS-115 - STS-115 MS Burbank and MacLean prepare the SARJ on the P3 - P4 Truss Segment during EVA

S115E05964 - STS-115 - STS-115 MS Burbank and MacLean prepare the SARJ...

The original finding aid described this as: Description: View of Astronauts Daniel C. Burbank, Mission Specialist (MS), wearing broken horizontal red stripes (left), and Steven G. MacLean, MS Canadian Space A... More

S115E06593 - STS-115 - STS-115 and Expedition 13 crewmembers in the U.S. Laboratory during Joint Operations

S115E06593 - STS-115 - STS-115 and Expedition 13 crewmembers in the U....

The original finding aid described this as: Description: View of STS-115 and Expedition 13 crewmembers in the U.S. Laboratory/Destiny during joint operations. From lert to right: Astronauts Steven G. MacLean... More

S115E05843 - STS-115 - Burbank prepares the SARJ on the P3 - P4 Truss Segment

S115E05843 - STS-115 - Burbank prepares the SARJ on the P3 - P4 Truss ...

The original finding aid described this as: Description: View of Astronaut Daniel C. Burbank, STS-115 Mission Specialist (MS), prepares the Solar Alpha Rotary Joint (SARJ) on the P3 - P4 Truss during second Ex... More

S115E06011 - STS-115 - STS-115 MS Burbank in the Quest A/L taken during Expedition 13 / STS-115 joint operations

S115E06011 - STS-115 - STS-115 MS Burbank in the Quest A/L taken durin...

The original finding aid described this as: Description: View of Daniel C. Burbank, STS-115 Mission Specialist (MS), looking at equipment in the Quest Airlock (A/L). Photo was taken during Expedition 13 / STS... More

S115E05850 - STS-115 - Burbank prepares the SARJ on the P3 - P4 Truss Segment

S115E05850 - STS-115 - Burbank prepares the SARJ on the P3 - P4 Truss ...

The original finding aid described this as: Description: View of Astronaut Daniel C. Burbank, STS-115 Mission Specialist (MS), prepares the Solar Alpha Rotary Joint (SARJ) on the P3 - P4 Truss during second Ex... More

S115E05848 - STS-115 - Burbank during second EVA Spacewalk

S115E05848 - STS-115 - Burbank during second EVA Spacewalk

The original finding aid described this as: Description: Close-up view of Astronaut Daniel C. Burbank, STS-115 Mission Specialist (MS) during second Extravehicular Activity (EVA) spacewalk. Subject Terms: STS... More

KENNEDY SPACE CENTER, FLA. -  In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay.  Looking at the airlock are Mission Specialists Steven MacLean (left) and Daniel Burbank (foreground). The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization,  a routine part of astronaut training and launch preparations.  The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station.  The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A.  Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1214

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NA...

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. Looking at the airlock are Mission Specialists... More

KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett introduces his crew to waiting media at KSC's Shuttle Landing Facility after their arrival from Houston.  At left are Mission Specialists Daniel Burbank, Steven MacLean and Joseph Tanner; at right are Mission Specialist Heidemarie Stefanyshyn-Piper and Pilot Christopher Ferguson. The STS-115 crew has flown to NASA's Kennedy Space Center to take part in Terminal Countdown Demonstration Test activities.  The TCDT is a pre-launch preparation that includes practicing emergency egress from the pad, driving an M-113 armored personnel carrier, and simulating the launch countdown. Launch of STS-115 is currently scheduled for Aug. 27.  Photo credit: NASA/George Shelton KSC-06pd1747

KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett introduces h...

KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett introduces his crew to waiting media at KSC's Shuttle Landing Facility after their arrival from Houston. At left are Mission Specialists Daniel Burbank... More

KENNEDY SPACE CENTER, FLA. -  STS-115 Commander Brent Jett takes his turn at the wheel, driving the M-113 armored personnel carrier.  Also on the ride are (left to right) Capt. George Hoggard, who is astronaut rescue team leader, and Mission Specialists Joseph Tanner, Steven MacLean and Daniel Burbank. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training.  They will also practice emergency egress from the launch pad and take part in a simulated launch countdown.  Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27.   Photo credit: NASA/Cory Huston KSC-06pd1762

KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett takes his t...

KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett takes his turn at the wheel, driving the M-113 armored personnel carrier. Also on the ride are (left to right) Capt. George Hoggard, who is astronaut ... More

KENNEDY SPACE CENTER, FLA. -  STS-115 Mission Specialist Steven MacLean takes his turn driving the M-113 armored personnel carrier. STS-115 Mission Specialist Steven MacLean takes his turn driving the M-113 armored personnel carrier. Passengers on the carrier are Mission Specialists Daniel Burbank and  Heidemarie Stefanyshyn-Piper, Pilot Christopher Ferguson and Capt. George Hoggard, who is astronaut rescue team leader. MacLean represents the Canadian Space Agency. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training.  They will also practice emergency egress from the launch pad and take part in a simulated launch countdown.  Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27.   Photo credit: NASA/Cory Huston KSC-06pd1755

KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Steven MacLea...

KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Steven MacLean takes his turn driving the M-113 armored personnel carrier. STS-115 Mission Specialist Steven MacLean takes his turn driving the M-113 arm... More

KENNEDY SPACE CENTER, FLA. -    In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. Looking up at the payload from left, are mission specialists Steven MacLean, who represents the Canadian Space Agency, Heidemarie Stefanyshyn-Piper, Joseph Tanner, and Daniel Burbank. The mission crew has been at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training, a simulated launch countdown and the payload familiarization. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston KSC-06pd1852

KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launc...

KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. Looking up at the payload from left, are mission ... More

KENNEDY SPACE CENTER, FLA. -  One of three T-38 jet aircraft with STS-115 crew members aboard lands at NASA Kennedy Space Center's Shuttle Landing Facility.  The crew is arriving to prepare for launch on Aug. 27 to the International Space Station.  Crew members are Commander Brent Jett, Pilot Christopher Ferguson and Mission Specialists Joseph Tanner, Daniel Burbank, Heidemarie Stefanyshyn-Piper and Steven MacLean, who represents the Canadian Space Agency. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost.  The truss includes a new set of photovoltaic solar arrays.  When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years.  STS-115 is expected to last 11 days and includes three scheduled spacewalks.    Photo credit: NASA/Kim Shiflett KSC-06pd1889

KENNEDY SPACE CENTER, FLA. - One of three T-38 jet aircraft with STS-...

KENNEDY SPACE CENTER, FLA. - One of three T-38 jet aircraft with STS-115 crew members aboard lands at NASA Kennedy Space Center's Shuttle Landing Facility. The crew is arriving to prepare for launch on Aug. 2... More

KENNEDY SPACE CENTER, FLA. -   Atlantis releases its drag chute to assist in landing on Runway 33 at NASA's Kennedy Space Center, concluding mission STS-115.  Aboard are Commander Brent Jett, Pilot Christopher Ferguson, and Mission Specialists Joseph Tanner, David Burbank, Heidemarie Stefanyshyn-Piper and Steven MacLean, who represents the Canadian Space Agency.  During the mission, Tanner, McLean, Burbank and Piper completed three spacewalks to attach the P3/P4 integrated truss structure to the International Space Station.  Main gear touchdown was at 6:21:30 a.m. EDT.  Nose gear touchdown was at 6:21:36 a.m. and wheel stop was at 6:22:16 a.m.  At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Atlantis traveled 4.9 million miles, landing on orbit 187. Mission elapsed time was 11 days, 19 hours, six minutes. This is the 15th night landing at KSC and the 23rd night landing overall.  Photo credit: NASA/Chuck Tintera KSC-06pd2189

KENNEDY SPACE CENTER, FLA. - Atlantis releases its drag chute to ass...

KENNEDY SPACE CENTER, FLA. - Atlantis releases its drag chute to assist in landing on Runway 33 at NASA's Kennedy Space Center, concluding mission STS-115. Aboard are Commander Brent Jett, Pilot Christopher ... More

KENNEDY SPACE CENTER, FLA. -   Just before dawn, Atlantis approaches touchdown on Runway 33 at NASA's Kennedy Space Center, concluding mission STS-115.   Aboard are Commander Brent Jett, Pilot Christopher Ferguson, and Mission Specialists Joseph Tanner, David Burbank, Heidemarie Stefanyshyn-Piper and Steven MacLean, who represents the Canadian Space Agency.  During the mission, Tanner, McLean, Burbank and Piper completed three spacewalks to attach the P3/P4 integrated truss structure to the International Space Station.  Main gear touchdown was at 6:21:30 a.m. EDT.  Nose gear touchdown was at 6:21:36 a.m. and wheel stop was at 6:22:16 a.m.  At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Atlantis traveled 4.9 million miles, landing on orbit 187. Mission elapsed time was 11 days, 19 hours, six minutes. This is the 15th night landing at KSC and the 23rd night landing overall.  Photo credit: NASA/Mike Kerley KSC-06pd2190

KENNEDY SPACE CENTER, FLA. - Just before dawn, Atlantis approaches t...

KENNEDY SPACE CENTER, FLA. - Just before dawn, Atlantis approaches touchdown on Runway 33 at NASA's Kennedy Space Center, concluding mission STS-115. Aboard are Commander Brent Jett, Pilot Christopher Fergu... More

At the Integration Facility at the Baikonur Cosmodrome in Kazakhstan, Expedition 30 Commander Dan Burbank of NASA (left) and Flight Engineer Anatoly Ivanishin share a moment during the checkout of their Russian Sokol launch and entry suits while conducting the first of two “fit checks” of their Soyuz TMA-22 spacecraft. Burbank, Ivanishin and Soyuz Commander Anton Shkaplerov will launch November 14 from Baikonur to the International Space Station.  November 1, 2011  Credit: NASA/Victor Zelentsov jsc2011e204934

At the Integration Facility at the Baikonur Cosmodrome in Kazakhstan, ...

At the Integration Facility at the Baikonur Cosmodrome in Kazakhstan, Expedition 30 Commander Dan Burbank of NASA (left) and Flight Engineer Anatoly Ivanishin share a moment during the checkout of their Russian... More

Burbank holds cameras in the U.S. Laboratory

Burbank holds cameras in the U.S. Laboratory

ISS030-E-175782 (15 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, works with two still cameras mounted together in the Destiny laboratory of the International Space Station. One camera is ... More

Burbank works with the MCA MSA of the Atmosphere Revitalization System

Burbank works with the MCA MSA of the Atmosphere Revitalization System

ISS030-E-047174 (23 Jan. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, works with the Major Constituent Analyzer Mass Spectrometer Assembly (MCA MSA) of the Atmosphere Revitalization system in ... More

Burbank enters High Salt Diet Information in Laptop

Burbank enters High Salt Diet Information in Laptop

ISS030-E-117431 (1 Feb. 2012) --- In the Columbus laboratory of the International Space Station, NASA astronaut Dan Burbank, Expedition 30 commander, enters data in a computer for the High Salt Diet protocol of... More

Burbank works on the EPIC in the Node 2

Burbank works on the EPIC in the Node 2

ISS030-E-114433 (29 Feb. 2012) --- In the International Space Station?s Destiny laboratory, NASA astronaut Dan Burbank, Expedition 30 commander, upgrades Multiplexer/Demultiplexer (MDM) computers and Portable C... More

Burbank and Kuipers close hatch

Burbank and Kuipers close hatch

ISS030-E-173924 (24 March 2012) --- NASA astronaut Dan Burbank (left), Expedition 30 commander; and European Space Agency astronaut Andre Kuipers, flight engineer, close a hatch in the International Space Stati... More

Burbank and Shkaplerov review crew procedures

Burbank and Shkaplerov review crew procedures

ISS030-E-171107 (24 March 2012) --- NASA astronaut Dan Burbank (left), Expedition 30 commander; and Russian cosmonaut Anton Shkaplerov, flight engineer, wearing communication headsets, review crew procedures in... More

Burbank, Calif., Sep. 10, 2013 -- Veronica Verde, FEMA External Affairs Officer and Tiffany Espensen, FEMA Youth Council, speak to Disney employees about emergency preparedness

Burbank, Calif., Sep. 10, 2013 -- Veronica Verde, FEMA External Affair...

The original finding aid described this as: Date Taken: 2013-09-10 00:00:00 UTC Photographer Name: Mary Simms City/State: Burbank, CA Disaster Types: Emergency Planning and Security Photographs Relating to ... More

CAPE CANAVERAL, Fla. – NASA astronaut Dan Burbank, who served as commander of Expedition 30 aboard the International Space Station, reviews still and video imagery of life aboard the orbiting laboratory during his presentation to Kennedy Space Center employees.      Burbank spent 165 days aboard the station during expeditions 29 and 30. For more information on the space station, visit http://www.nasa.gov/mission_pages/station/expeditions/index.html  Photo credit: NASA/Kim Shiflett & Gianni Woods KSC-2013-2599

CAPE CANAVERAL, Fla. – NASA astronaut Dan Burbank, who served as comma...

CAPE CANAVERAL, Fla. – NASA astronaut Dan Burbank, who served as commander of Expedition 30 aboard the International Space Station, reviews still and video imagery of life aboard the orbiting laboratory during ... More

Erik DeShane, Management and Program Analyst for the

Erik DeShane, Management and Program Analyst for the

Erik DeShane, Management and Program Analyst for the U.S. Department of Homeland Security, briefs key leaders at the forward operating base for a key leaders visit during the Prominent Hunt 18-1 exercise at Bur... More

Chief of Staff of the Army Gen. Raymond T. Odierno, left, and members of his staff tour the facilities at NBC Universal Studios in Burbank, Calif., June 11, 2012 120611-A-AO884-074

Chief of Staff of the Army Gen. Raymond T. Odierno, left, and members ...

Chief of Staff of the Army Gen. Raymond T. Odierno, left, and members of his staff tour the facilities at NBC Universal Studios in Burbank, Calif., June 11, 2012. Odierno met with senior executives and militar... More

Walt Disney Studios, Service Station, Alameda Avenue & Buena Vista Street, Burbank, Los Angeles County, CA

Walt Disney Studios, Service Station, Alameda Avenue & Buena Vista Str...

Significance: The Service Station is part of the Disney Studio complex, many buildings of which were constructed at the same time during the early 1940s. Although utilizing the same general stylistic scheme, t... More

Walt Disney Studios, Service Station, Alameda Avenue & Buena Vista Street, Burbank, Los Angeles County, CA

Walt Disney Studios, Service Station, Alameda Avenue & Buena Vista Str...

Significance: The Service Station is part of the Disney Studio complex, many buildings of which were constructed at the same time during the early 1940s. Although utilizing the same general stylistic scheme, t... More

Luther Burbank House, 200 Santa Rosa Avenue, Santa Rosa, Sonoma County, CA

Luther Burbank House, 200 Santa Rosa Avenue, Santa Rosa, Sonoma County...

Significance: The Burbank House is significant as it was the residence of Luther Burbank during a very productive portion of his life and was the site of his early work in plant research and breeding. The hous... More

Luther Burbank House, Greenhouse, 200 Santa Rosa Avenue, Santa Rosa, Sonoma County, CA

Luther Burbank House, Greenhouse, 200 Santa Rosa Avenue, Santa Rosa, S...

Significance: Greenhouse of Luther Burbank, famed nurseryman and horticulturalist / In 1885, Luther Burbank bought a four acre plot of land on the southern edge of Santa Rosa. On this site, he worked for forty... More

Luther Burbank House, Gardens, 200 Santa Rosa Avenue, Santa Rosa, Sonoma County, CA

Luther Burbank House, Gardens, 200 Santa Rosa Avenue, Santa Rosa, Sono...

Significance: Luther Burbank purchased the property in 1884. On this site he lived 22 years and worked as a horticulturalist for 41 years. The site presently contains his residence, greenhouse, carriage house... More

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista Street, Burbank, Los Angeles County, CA

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista St...

Significance: Designed in 1938 and built in 1939, the Casting Building is one of the original buildings constructed at the Burbank Disney Studios on Buena Vista Street after the studio moved from Hyperion Avenu... More

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista Street, Burbank, Los Angeles County, CA

Walt Disney Studios, Casting Building, Alameda Avenue & Buena Vista St...

Significance: Designed in 1938 and built in 1939, the Casting Building is one of the original buildings constructed at the Burbank Disney Studios on Buena Vista Street after the studio moved from Hyperion Avenu... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street & Alameda Avenue, Burbank, Los Angeles County, CA

Walt Disney Studios, Process Laboratory, Corner of Buena Vista Street ...

Significance: The Process Lab is part of the Disney Studio complex, the buildings of which were built in a single style during the early 1940s. The Laboratory was the site of the development and implementation... More

Luther Burbank - Public domain photograph, glass negative

Luther Burbank - Public domain photograph, glass negative

A black and white photo of a man sitting in a rocking chair. Public domain portrait photograph, free to use, no copyright restrictions image - Picryl description

Fruitful spineless cactus, Luther Burbank's experimental grounds, Santa Rose, California / Turrill & Miller Photo, S.F.

Fruitful spineless cactus, Luther Burbank's experimental grounds, Sant...

Photograph shows a field of cactus and houses in the distance, at the Luther Burbank residence, Santa Rosa, California. H117457 U.S. Copyright Office. Place of publication and publisher information transcribed... More

Vega Aircraft Corporation. Burbank, California

Vega Aircraft Corporation. Burbank, California

Picryl description: Public domain image of a factory, plant, manufacture, assembly line, industrial facility, early 20th-century industrial architecture, free to use, no copyright restrictions.

Self-help cooperative, Burbank, California. Supplies food, vegetables and milk to members

Self-help cooperative, Burbank, California. Supplies food, vegetables ...

Public domain photograph of an automobile, 1920s car, free to use, no copyright restrictions image - Picryl description

Car pooling at Lockheed Vega. This clever poster tells Don how the lone rider aids our enemies and tells him where to go to get transportation with another employee blessed with better tires

Car pooling at Lockheed Vega. This clever poster tells Don how the lon...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Women aircraft workers. Nice work if you can get it. A leadman instructs a young war worker in proper numbering and color marking of electrical sub-assemblies. Both are employees of a large West Coast aircraft factory. Lockhead

Women aircraft workers. Nice work if you can get it. A leadman instruc...

Picryl description: Public domain image of military personnel, army, group photograph, armed people in uniform, war inspection, free to use, no copyright restrictions.

Car pooling at Lockheed Vega. Day shift leaving gate no. 4. Lockheed Vega aircraft plant. Company employees travel home by special Lockheed-chartered busses, by pooling their automobiles and by bicycles

Car pooling at Lockheed Vega. Day shift leaving gate no. 4. Lockheed V...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Production. Lockheed P-38 pursuit planes. A liquid-cooled turbo-supercharged Allison engine is installed in a new Lockheed P-38 pursuit ship. This engine has carried the P-38 through brilliant performances in the Aleutians. The P-38 is an excellent high- altitude fighter with great firepower. Its speed at its best altitude gives it rank among the world's fastest fighting aircraft

Production. Lockheed P-38 pursuit planes. A liquid-cooled turbo-superc...

Picryl description: Public domain image of an aircraft, assembly line, industrial facility, 1930s aviation, free to use, no copyright restrictions.

Women aircraft workers. In a West Coast aircraft plant, this young woman is trimming material for the bullet proofing of gas tanks. The material is developed from pure latex, is highly gasoline solvent and seals bullet holes

Women aircraft workers. In a West Coast aircraft plant, this young wom...

Public domain photograph of California in 1930s, free to use, no copyright restrictions image - Picryl description

Production. Lockheed P-38 pursuit planes. Three-blade variable pitch propellers are prepared for installation on Lockheed P-38 pursuit planes at a large Western aircraft plant. The planes they will pull have been performing brilliantly as interceptors of enemy aircraft

Production. Lockheed P-38 pursuit planes. Three-blade variable pitch p...

Actual size of negative is C (approximately 4 x 5 inches). Title and other information from caption card. Transfer; United States. Office of War Information. Overseas Picture Division. Washington Division; 1944... More

Production. Ventura bombers. The "Pony Express" driver in a large Western aircraft plant rounds the corner of "Bataan Boulevard," one of the assembly lines on which many fighting and bombing planes are being built. His work is to distribute parts for Ventura bombers and other mighty ships of our new air armada. Vega Aircraft Corporation, Burbank, California

Production. Ventura bombers. The "Pony Express" driver in a large West...

Picryl description: Public domain image of a political campaign, politician, office meeting, 1930s, mid-20th-century United States, free to use, no copyright restrictions.

Production. Lockheed P-38 pursuit planes. New Lockheed P-38 pursuit ships receive final inspections and adjustments on assembly lines outside a large Western aircraft plant. After these operations, the ships will be taken out for routine test flights. If the flights prove satisfactory, the new planes will be ready for delivery to the Army

Production. Lockheed P-38 pursuit planes. New Lockheed P-38 pursuit sh...

Picryl description: Public domain image of a bomber aircraft, military aviation, air forces, free to use, no copyright restrictions.

The STS-106 rush from the Operations and Checkout Building and wave to onlookers on their way to Launch Pad 39B. In rows (front to back) are Commander Terrence W. Wilcutt (left), Pilot Scott D. Altman (right); Mission Specialists Edward T. Lu (left), Yuri I. Malenchenko (right); Richard A. Mastracchio (left), Boris V. Morukov (right); and Daniel C. Burbank (left). Liftoff of Space Shuttle Atlantis is set for 8:45 a.m. EDT on the fourth flight to the International Space Station. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00padig029

The STS-106 rush from the Operations and Checkout Building and wave to...

The STS-106 rush from the Operations and Checkout Building and wave to onlookers on their way to Launch Pad 39B. In rows (front to back) are Commander Terrence W. Wilcutt (left), Pilot Scott D. Altman (right); ... More

STS106-369-032 - STS-106 - Burbank and Mastracchio pose in SpaceHab during STS-106

STS106-369-032 - STS-106 - Burbank and Mastracchio pose in SpaceHab du...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (left) and MS Richard ``Rick`` Mastracchio pose in the SpaceHab Double Module. Subject Terms: STS-106, A... More

S106E5025 - STS-106 - MS Burbank and MS Mastracchio at work aboard Atlantis during STS-106

S106E5025 - STS-106 - MS Burbank and MS Mastracchio at work aboard Atl...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (center) and MS Richard Mastracchio (far left) at work onboard the middeck of Atlantis, Orbiter Vehicle (... More

STS106-319-012 - STS-106 - MS Burbank and MS Lu work in PMA1 during STS-106

STS106-319-012 - STS-106 - MS Burbank and MS Lu work in PMA1 during ST...

The original finding aid described this as: Description: STS-106 Mission Specialist (MS) Daniel Burbank (left) and MS Edward Lu work in the hatch between Node 1 / Unity and Pressurized Mating Adapter 1 (PMA1) ... More

STS106-386-007 - STS-106 - Burbank,Wilcutt and Morukov work on the middeck during STS-106

STS106-386-007 - STS-106 - Burbank,Wilcutt and Morukov work on the mid...

The original finding aid described this as: Description: STS-106 Commander Terrence ``Terry`` Wilcutt (left), Mission Specialist (MS) / cosmonaut Boris Morukov and MS Daniel Burbank work with pipes and cables ... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-106 Pilot Scott D. Altman and Commander Terrence W. Wilcutt look over equipment that will be flown on the mission. Behind them (left) are Mission Specialists Edward T. Lu, Boris V. Morukov and Richard A. Mastracchio. They and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank are taking part Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0957

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-106 Pilot Scott D. Altm...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-106 Pilot Scott D. Altman and Commander Terrence W. Wilcutt look over equipment that will be flown on the mission. Behind them (left) are Mission Specialists Edwar... More

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC-00pp0952

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test...

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using du... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0961

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CE...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on th... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-106 Pilot Scott D. Altman and Commander Terrence W. Wilcutt look over equipment that will be flown on the mission. Behind them (left) are Mission Specialists Edward T. Lu, Boris V. Morukov and Richard A. Mastracchio. They and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank are taking part Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0957

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-106 Pilot Scott D. Altm...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-106 Pilot Scott D. Altman and Commander Terrence W. Wilcutt look over equipment that will be flown on the mission. Behind them (left) are Mission Specialists Edwar... More

Previous

of 13

Next