PICRYL
PICRYLThe World's Largest Public Domain Source
  • homeHome
  • searchSearch
  • photo_albumStories
  • collectionsCollections
  • infoAbout
  • star_rateUpgrade
  • account_boxLogin

U.S. Navy Seabees, assigned to Amphibious Construction Battalion One (ACB-1), prepare for the unload of equipment.

A Logistical Amphibious Recovery Craft (LARC) amphibious vehicle assigned to Beachmaster Unit One (BMU-1) launches from the Military Sealift Command (MSC) sea barge heavy lift ship SS Cape Mohican (T-AKR 5065).

U.S. Navy Seabee Amphibious Construction Battalion One (ACB-1) uses a landing craft to move several vehicles to the pier at Indian Island Naval Magazine.

Sailors assigned to Amphibious Construction Battalion One begins to offload the Military Sealift Command (MSC) heavy lift ship SS Cape Mohican (T-AKR 5065).

Sailors assigned to Amphibious Construction Battalion One offload the Improved Navy Lighter age System (INLS) from the Military Sealift Command (MSC) heavy lift ship SS Cape Mohican (T-AKR 5065) for Humanitarian Support over the Shore (HSOTS) 2007.

Two Amphibious Construction Battalion (ACB) 1 Improved Navy Lighterage System (INLS) crafts stand-by.

The Military Sealift Command heavy lift ship SS Cape Mohican (T-AKR 5065) carries Navy Lighterage, Landing Craft Air Cushion (LCAC), and Navy Roll-on Roll-off Discharge Facility (RRDF).

Sailors attached to Amphibious Construction Battalion (ACB) 1, on the improved Navy lighterage system (INLS) Warping Tug 2 back out from the elevator of the Military Sealift Command heavy lift ship SS Cape Mohican (T-AKR 5065).

Sailors attached to Amphibious Construction Battalion (ACB) 1 and 2, wait as they get into position to deliver two improved Navy lighterage system (INLS) combination modules.

Sailors attached to Amphibious Construction Battalion (ACB) 1 and Navy Cargo Handling Battalion (NCHB) 1 help tie down an improved Navy lighterage ramp module.

Builder Constructionman Erica Kachur, attached to Amphibious Construction Battalion (ACB) 1, Charlie Company, makes measurements on the frame of a Southwest Asia Hut during Brilliant Zenith 2015 (BZ15).

Seaman Phong Lo, attached Amphibious Construction Battalion (ACB) 1, uses a pneumatic wrench to unlatch the Improve Navy Lighterage System Power Module 17.

Sailors attached to Amphibious Construction Battalion (ACB) 1 and Navy Cargo Handling Battalion (NCHB) 1 tie down sections of improved Navy lighterage system combination modules.

Steel Worker Constructionman Joshua Kopit, assigned to Amphibious Construction Battalion (ACB) 1, Charlie Company, helps construct studs for the walls of a Southwest Asia Hut during Brilliant Zenith 2015 (BZ15).

Equipment Operator 1st Class Justin Hudson, assigned to Amphibious Construction Battalion (ACB) 1, Alfa Company, guides a bulldozer during Exercise Brilliant Zenith 2015 (BZ15).

Seabees attached to Amphibious Construction Battalion (ACB) 1, Alfa Company, use a bulldozer to build a sand ramp during Exercise Brilliant Zenith 2015 (BZ15).

Seabees assigned to Amphibious Construction Battalion (ACB) 1, Alfa Company, use a bulldozer to build a sand ramp during Exercise Brilliant Zenith 2015 (BZ15).

Seabees attached to Amphibious Construction Battalion (ACB) 1, Alfa Company, use a bulldozer to build a sand ramp during Exercise Brilliant Zenith 2015 (BZ15).

Sailors assigned to Amphibious Construction Battalion (ACB) 1 and 2 set anchors to stabilize the improved Navy lighterage system (INLS) floating causeway during Exercise Brilliant Zenith 2015 (BZ15).

Sailors assigned to Amphibious Construction Battalion (ACB) 1 and 2 move an anchor onto the improved Navy lighterage system (INLS) floating causeway during Exercise Brilliant Zenith 2015 (BZ15).

Sailors assigned to Amphibious Construction Battalion (ACB) 1 and 2 aboard the improved Navy lighterage system (INLS) Warping Tug 4 move an anchor off the INLS floating causeway during Exercise Brilliant Zenith 2015 (BZ15).

The improved Navy lighterage system (INLS) floating causeway stabs the sand ramp during Exercise Brilliant Zenith 2015 (BZ15).

Landing Craft Air Cushion 33, attached to Assault Craft Unit 5, exits from the elevator of the Military Sealift Command heavy lift ship SS Cape Mohican (T-AKR 5065) during Exercise Brilliant Zenith 2015 (BZ15).

Engineman 2nd Class Francisco Sierra and Seaman Krista Milam, both assigned to Amphibious Construction Battalion (ACB) 1, tie down cargo aboard the improved Navy lighterage system (INLS) Causeway Ferry 17.

The improved Navy lighterage system (INLS) Causeway Ferry 17 prepares to land on the sand ramp during Exercise Brilliant Zenith 2015 (BZ15).