The World's Largest Public Domain Media Search Engine
Space Shuttle Project, Marshall Space Flight Center

Similar

Space Shuttle Project, Marshall Space Flight Center

description

Summary

The Shuttle Orbiter Enterprise is off-loaded Redstone Arsenal Airfield for later Mated Vertical Ground Vibration tests (MVGVT) at Marshall Space Flight Center's Dynamic Test Stand. The tests marked the first time ever that the entire shuttle complement (including orbiter, external tank, and solid rocket boosters) were mated vertically.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

14/03/1978
place

Location

Marshall Spaceflight Center, Huntsville, Madison County, Alabama, United States, 3580834.63076, -86.66505
Google Map of 34.6307645, -86.665052
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

enterprise
enterprise