The World's Largest Public Domain Media Search Engine
Covered in a protective sheath, International  Space Station  Node 1 is hoisted from its transporting container for installation in its work  stand in the Space Station Processing Facility. The module is the first element of the  International Space Station to be manufactured in the United States and the first  scheduled to be launched on the Space Shuttle. The Node 1  is currently scheduled to lift  off aboard the Space Shuttle Endeavour in July 1998, along with Pressurized Mating  Adapters (PMAs) 1 and 2. The 18-foot-in-diameter, 22-foot-long aluminum module was  manufactured by the Boeing Co. at  Marshall Space Flight Center. Once in space, the  Node 1 will function as a connecting passageway to the living and working areas of the  International Space Station. It has six hatches that will serve as docking ports to the U.S.  laboratory module, U.S. habitation module, an airlock and other space station elements KSC-97PC935

Similar

Covered in a protective sheath, International Space Station Node 1 is hoisted from its transporting container for installation in its work stand in the Space Station Processing Facility. The module is the first element of the International Space Station to be manufactured in the United States and the first scheduled to be launched on the Space Shuttle. The Node 1 is currently scheduled to lift off aboard the Space Shuttle Endeavour in July 1998, along with Pressurized Mating Adapters (PMAs) 1 and 2. The 18-foot-in-diameter, 22-foot-long aluminum module was manufactured by the Boeing Co. at Marshall Space Flight Center. Once in space, the Node 1 will function as a connecting passageway to the living and working areas of the International Space Station. It has six hatches that will serve as docking ports to the U.S. laboratory module, U.S. habitation module, an airlock and other space station elements KSC-97PC935

description

Summary

Covered in a protective sheath, International Space Station Node 1 is hoisted from its transporting container for installation in its work stand in the Space Station Processing Facility. The module is the first element of the International Space Station to be manufactured in the United States and the first scheduled to be launched on the Space Shuttle. The Node 1 is currently scheduled to lift off aboard the Space Shuttle Endeavour in July 1998, along with Pressurized Mating Adapters (PMAs) 1 and 2. The 18-foot-in-diameter, 22-foot-long aluminum module was manufactured by the Boeing Co. at Marshall Space Flight Center. Once in space, the Node 1 will function as a connecting passageway to the living and working areas of the International Space Station. It has six hatches that will serve as docking ports to the U.S. laboratory module, U.S. habitation module, an airlock and other space station elements

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

25/06/1997
place

Location

Kennedy Space Center, FL
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center