The World's Largest Public Domain Media Search Engine
Saturn V - Saturn Apollo Program

Similar

Saturn V - Saturn Apollo Program

description

Summary

At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was originally designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage. Modifications to the S-IC Test Stand began in 1975 to accommodate space shuttle external tank testing. This photo depicts the continuation of the modification process as of July 14, 1975. The flame deflector originally used to provide water to the 5 F-1 engines of the S-IC stage during testing has been removed.

date_range

Date

14/07/1975
place

Location

Marshall Spaceflight Center, Huntsville, Madison County, Alabama, United States, 3580834.63076, -86.66505
Google Map of 34.6307645, -86.665052
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

saturn v
saturn v